Update on the Union-Bulletin Press installation in Walla Walla, Washington

The imPRESSions Worldwide installation team along with staff of the Union-Bulletin began offloading the three tower Press on November 11th. Most of the equipment is now in place and leveled, lined and trammed. Finishing touches like catwalk and railing are now underway in preparation for the plumbing and electrical work to begin. Here’s a look in 60 seconds.